```

The Case for Bringing in Outside Consultants

by | Jun 10, 2026 | the Bid Fusion Brief

Last month I attended the APMP conference, and it reinforced something I have been thinking about for a while. The best-performing bid teams are not necessarily the biggest ones. They are the ones resourced smartly, with the right people contributing at the right time. Bringing in outside consultants is one of the most effective ways to achieve that.

The Root Cause Is Not Workload. Its Strategy.

Most organisations treat bid consultants as emergency infrastructure. Something you call when a submission is due in 72 hours, and your senior writer is already stretched. That model actively creates conditions for burnout.

By the time a consultant is brought in under those circumstances, the damage is done. The brief is rushed. The strategy is underdeveloped. The in-house team is still carrying the load because there is no time to hand anything over properly. The consultant is parachuting into a crisis rather than contributing to a plan.

The fix is not a permanent headcount. Bid volume is uneven across the year. It spikes around procurement cycles, then quietens. Permanent resourcing for peak demand creates its own pressure during quieter periods.

The fix is to build consultants into the resourcing model as business as usual.

The Surge Capacity Argument

Surge capacity is the ability of a team or organisation to rapidly scale up resources, bandwidth, or capability in response to a sudden spike in demand, beyond what normal operations can absorb. In bid management, that means having skilled resources ready to step in during high-pressure periods, multiple concurrent pursuits, tight deadlines, or an unplanned absence, without compromising quality or pace.

Organisations that build surge capacity into their resourcing model gain a genuine competitive advantage. They can pursue more opportunities with confidence. They can respond to short notice tenders that others walk away from. They can maintain quality across a busy pipeline rather than rationing effort across too many bids at once.

Outside consultants are the most practical and cost-effective way to build that capacity. Engaged as part of a planned resourcing strategy, they give bid teams the flexibility to scale up when it counts and scale back when the pressure eases, without the overhead of permanent headcount. That agility is valuable. For many organisations, it is the difference between a sustainable bid function and one that is perpetually running to stand still.

There is a human benefit too. When peaks are absorbed by planned resources rather than absorbed by people, the core team can do their best work without the cost to their wellbeing. Protecting capacity protects people. And teams that feel sustainable tend to stay together.

Better Bids. Burnout Avoided.

Fractional support, planned rather than commissioned in crisis, changes the dynamic entirely. When a consultant is brought in at the strategy stage, they contribute meaningfully. Win themes are sharper. The narrative is stronger. The in-house team retains ownership of client relationships while having genuine support on the work itself.

Senior writers and bid managers can focus on strategy and stakeholder engagement rather than being buried in first drafts. That is the work that differentiates a bid. Protecting that space protects retention.

The Commercial Case

Some organisations hesitate at the cost. Consultants do cost more per day than a permanent employee, and that number is visible on a budget line. What is less visible, but equally real, is the cost of not investing in flexible support.

A skilled bid writer who leaves takes years of client knowledge, evaluator insight, and competitive history. Recruitment, onboarding, and the quality gap during transition all carry a cost. For most organisations, those costs exceed the flexible support that would have prevented the resignation.

Then consider the bid itself. A submission produced by a stretched team under pressure rarely reflects the team’s true capability. The cost of a lost tender, including the time invested in producing it, is rarely calculated. When it is, the math’s supports better resourcing.

The Question Worth Asking

If you lead a bid team, the question is not whether your people are coping. It is whether your resourcing model is designed to produce the best possible outcomes, or simply to get submissions out the door.

The two are not the same thing.

The good news is that the fix is straightforward. Build flexibility into your resourcing plan. Engage consultants early, not in crisis. Give your team the capacity to do the work they are best at. The results follow.

Hello I'm Jane Korn

With more than 25 years’ experience in strategic communications and over a decade leading bid and proposal functions, I help organisations articulate their value, align stakeholders and improve pursuit performance.

Through my monthly newsletter, the Bid Fusion Brief, I share practical insights to help leaders strengthen pursuit capability, improve organisational alignment and win complex opportunities across all sectors.

The Bid Fusion Brief